EFI, Tear down

As the season turns from summer to fall we are finally able to take the time to start the tear down of EFI. Most of the front plastics were cracked and damaged beyond repair so they were removed and a donor will be found. We dropped in the new lights from truck Lite and tore off both of the front and rear bumpers. The cheap after market step rails were also tossed.

The next major item is to put up the enclosure so that we can carry on with the rebuild during the winter.

Currently, EFI needs new shocks (all around), brakes, (all around), Alternator, Ignition, plugs, wires, new radiator and a flush of all fluids. We may find more as we dig further.

image

image

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>